logo
products
PRODUCTS DETAILS
Home > Products >
Metal Carbon Plate Steel Welding Service For Large Equipment Assembly

Metal Carbon Plate Steel Welding Service For Large Equipment Assembly

MOQ: 1Tons
Price: US$800.00-1000.00
Payment Method: MoneyGram,Western Union,T/T,D/P,D/A,L/C
Supply Capacity: 300,000 tons per year
Detail Information
Place of Origin
China
Brand Name
ZheTai Supply Chain Group
Certification
GB/T19001-2016 idt IS09001:2015
Model Number
Steel Welding Processing
Material:
Steel
Welding Current:
Direct Current (DC)
Welding Method:
Manual
Welding Type:
Arc Welding
Electrode Diameter:
1/8 Inch
Welding Voltage:
20-30 Volts
Electrode:
Tungsten
Preheating Temperature:
200-300 Degrees Celsius
Highlight:

Carbon Plate Steel Welding Service

,

Large Equipment Steel Welding Service

,

Large Equipment Assembly Steel Welding

Product Description

Metal Machinery Carbon Plate Steel Plate WeldingProcessing Services -Large Equipment Assembly

 

When assembling large equipment, due to bulk purchase of parts and materials, more favorable prices can be obtained. At the same time, centralized assembly operations can fully utilize equipment and tooling fixtures, reducing equipment depreciation and tooling costs per unit product. For example, in the assembly plant of large construction machinery, by purchasing a large number of standard parts such as bolts and nuts of the same model, the procurement cost can be reduced. And due to the centralized assembly tasks, the idle time of equipment can be reduced and the equipment utilization rate can be improved.

 

Through strict quality control measures and standardized assembly processes, rework situations caused by improper assembly can be effectively reduced. Rework not only wastes time and materials but may also cause damage to already installed parts. In large equipment assembly, due to the relatively complete quality assurance system, the rework rate is relatively low, thus reducing costs.

 

Regular thickness and material standards of steel plate cutting parts
Product Carbon steel plate cutting parts
Thickness 8MM-500MM
Breadth 80MM-2300MM
Length 80MM-11800MM
Material/brand

Q235B,SS400,S235JR,A36,Q355B,S355JR,S355J2,A709Gr50,Q345R,

SPV355,19MnR,P355GH,A737Gr.b,45#,S45C,C45,1045

UT inspection standard Sel072-77,EN10228,JIS G3136,ASTM A370:Level three, level two, level one
Package Export Standard Wooden Pallets
Payment terms L/C at sight or 30% T/T in advance as deposit, and 70% balance against the B/L copy.
Minimum order quantity 1 Tons Per Specification
Delivery time Within 7-10 Days
Port of loading Shanghai,Ningbo
Application field New energy automobile stamping line equipment, home appliance mold, engineering steel structure, engineering machinery, mechanical equipment, machine tools, punches, shears, hydraulic press equipment, hydraulic engineering, offshore land wind power equipment, tunnel shield machine engineering, metallurgical equipment, rolling mill equipment, mechanical and electrical equipment, chemical vulcanization machine equipment, automobile tire equipment and so on.

 

OUR WORKSHOPS

Metal Carbon Plate Steel Welding Service For Large Equipment Assembly 0

PACKING AND SHIPPING

Metal Carbon Plate Steel Welding Service For Large Equipment Assembly 1

Metal Carbon Plate Steel Welding Service For Large Equipment Assembly 2

OUR ADVANTAGE

Metal Carbon Plate Steel Welding Service For Large Equipment Assembly 3

 

Steel welding processing is an important means of connecting mechanical parts. In machine tool manufacturing, the connections of large - scale components such as beds and columns, as well as the connections of various shaft - type parts and hubs, may all adopt welding. In the manufacturing of construction machinery, components such as the working arms of excavators and the buckets of loaders are also fabricated through welding processing.

products
PRODUCTS DETAILS
Metal Carbon Plate Steel Welding Service For Large Equipment Assembly
MOQ: 1Tons
Price: US$800.00-1000.00
Payment Method: MoneyGram,Western Union,T/T,D/P,D/A,L/C
Supply Capacity: 300,000 tons per year
Detail Information
Place of Origin
China
Brand Name
ZheTai Supply Chain Group
Certification
GB/T19001-2016 idt IS09001:2015
Model Number
Steel Welding Processing
Material:
Steel
Welding Current:
Direct Current (DC)
Welding Method:
Manual
Welding Type:
Arc Welding
Electrode Diameter:
1/8 Inch
Welding Voltage:
20-30 Volts
Electrode:
Tungsten
Preheating Temperature:
200-300 Degrees Celsius
Minimum Order Quantity:
1Tons
Price:
US$800.00-1000.00
Payment Terms:
MoneyGram,Western Union,T/T,D/P,D/A,L/C
Supply Ability:
300,000 tons per year
Highlight

Carbon Plate Steel Welding Service

,

Large Equipment Steel Welding Service

,

Large Equipment Assembly Steel Welding

Product Description

Metal Machinery Carbon Plate Steel Plate WeldingProcessing Services -Large Equipment Assembly

 

When assembling large equipment, due to bulk purchase of parts and materials, more favorable prices can be obtained. At the same time, centralized assembly operations can fully utilize equipment and tooling fixtures, reducing equipment depreciation and tooling costs per unit product. For example, in the assembly plant of large construction machinery, by purchasing a large number of standard parts such as bolts and nuts of the same model, the procurement cost can be reduced. And due to the centralized assembly tasks, the idle time of equipment can be reduced and the equipment utilization rate can be improved.

 

Through strict quality control measures and standardized assembly processes, rework situations caused by improper assembly can be effectively reduced. Rework not only wastes time and materials but may also cause damage to already installed parts. In large equipment assembly, due to the relatively complete quality assurance system, the rework rate is relatively low, thus reducing costs.

 

Regular thickness and material standards of steel plate cutting parts
Product Carbon steel plate cutting parts
Thickness 8MM-500MM
Breadth 80MM-2300MM
Length 80MM-11800MM
Material/brand

Q235B,SS400,S235JR,A36,Q355B,S355JR,S355J2,A709Gr50,Q345R,

SPV355,19MnR,P355GH,A737Gr.b,45#,S45C,C45,1045

UT inspection standard Sel072-77,EN10228,JIS G3136,ASTM A370:Level three, level two, level one
Package Export Standard Wooden Pallets
Payment terms L/C at sight or 30% T/T in advance as deposit, and 70% balance against the B/L copy.
Minimum order quantity 1 Tons Per Specification
Delivery time Within 7-10 Days
Port of loading Shanghai,Ningbo
Application field New energy automobile stamping line equipment, home appliance mold, engineering steel structure, engineering machinery, mechanical equipment, machine tools, punches, shears, hydraulic press equipment, hydraulic engineering, offshore land wind power equipment, tunnel shield machine engineering, metallurgical equipment, rolling mill equipment, mechanical and electrical equipment, chemical vulcanization machine equipment, automobile tire equipment and so on.

 

OUR WORKSHOPS

Metal Carbon Plate Steel Welding Service For Large Equipment Assembly 0

PACKING AND SHIPPING

Metal Carbon Plate Steel Welding Service For Large Equipment Assembly 1

Metal Carbon Plate Steel Welding Service For Large Equipment Assembly 2

OUR ADVANTAGE

Metal Carbon Plate Steel Welding Service For Large Equipment Assembly 3

 

Steel welding processing is an important means of connecting mechanical parts. In machine tool manufacturing, the connections of large - scale components such as beds and columns, as well as the connections of various shaft - type parts and hubs, may all adopt welding. In the manufacturing of construction machinery, components such as the working arms of excavators and the buckets of loaders are also fabricated through welding processing.

Sitemap |  Privacy Policy | China Good Quality CNC Cutting Service Supplier. Copyright © 2024-2025 ZheTai Supply Chain . All Rights Reserved.